Need a Quote?

Contact Us

(978) 319-6567

170 Lorum Street Tewksbury, MA 01876

Interior Project Timeline

Thank you for completing the questionnaire. Here is your Interior Project Timeline.

The interior project timeline for Metro Sign & Awning details a comprehensive 25-29 week process for developing and installing ADA-compliant interior signage. The initial phase includes assessing project scope, creating a sign schedule, and preparing a budgetary quote, which takes about 4-7 weeks. This is followed by design work, client reviews, revisions, and final approvals, adding another 8-10 weeks.

The production phase, including site surveys, fabrication, and installation, spans approximately 7-10 weeks, culminating in a punch list phase to ensure all signage meets the required standards and client expectations. The address is essential during the site survey phase as it provides the necessary context for regulatory compliance and ensures that all signage adheres to local building codes and ADA requirements.

Action Estimated Time of Completion
Assess the project scope: Determine the size and complexity of the interior ADA signage program. Consider factors such as the number of signs needed, materials required, and any customization or special requirements.
1 week
Create a sign schedule: Develop a comprehensive list of all the signs needed for the project, including their location, size, text, and any other specifications required to meet ADA compliance.

2 - 3 weeks

Prepare a budgetary quote.
1 week
Once budget is determined and preliminary estimate is signed, design work is initiated for the development of sign types required for certificate of occupancy. To include size, font, color contrast, mounting height, and tactile and design features to coordinate with interior design materials and architectural details.

2 - 3 weeks

After client review and feedback revision requests are returned. Simultaneously client provides artwork of egress routes from architect.
1 week
Updated designs per the revision request are submitted along with egress map layouts.
1 week
Sign Types are approved. MetroSign prepares sign schedule.
2 weeks
Sign schedule review by client is returned with any edits.
2 weeks
Revisions to sign schedule.
1 week
Approval of sign schedule. Quote is updated to match.
1 week
Development of production artwork for any wayfinding and code compliant stairwell signage approved as part of sign schedule.
1 week
Conduct a site survey: Visit the location where the ADA signage will be installed to assess the layout, existing signage, and any obstacles that may affect installation. Information relayed to design for any necessary adjustments
1 week
Obtain final approval: Present the finalized proposal to the client or relevant stakeholders for approval before proceeding with production and installation.
1 week
Fabrication of sign package.

5 weeks

Installation: (depending on scope of work and access to all levels). Assumes building is ready for full installation of all signage. Walls should have been painted no less than 4 weeks prior to installing tape mounted signs.
1 week
Punchlist

2 - 4 weeks

TOTAL ESTIMATED PROJECT COMPLETION

25 - 29 weeks

Contact

Call Us: (978) 319-6567

Fax Us: (978) 851-2022

Visit Us: 170 Lorum St, Tewksbury, MA 01876

Follow Us:

Send Us a Message

This field is for validation purposes and should be left unchanged.

We accept the following payment methods:
American Express
Amex
Visa
Visa
MasterCard
MasterCard
Discover
Discover
Purchase Orders & ACH/EFT transactions
Terms & Conditions

Back to Top